Supply and installation of the following Plumbing & Drainage systems
- Preparing Builder work drawings
- Preparing Shop drawings
- Preparing Coordination drawings
- Preparing Construction drawings
- HVAC Ducting works
- Sound Attenuation
- Chilled Water Pipe Installation
- Installation of Exhaust Fans
- Installation of Chillers, AHU’s, FCU’s, FAHU’s
- Installation of Package Units
- Installation of all Ducted Split Units
- Installation of VRF System
- Valve Package for AHU’s, Chillers, FCU’s & Pumps
- Installation of CHW pumps / Chemical Dosing Unit / Pressurization Units /
- Installation of VCD/FD/NRD/Split Dampers
- Aluminum Cladding Works (Pipe & Duct)
- CHW Pipe Pressure Testing
- Refrigerant Piping Works
- Air Terminals Installation
- Thermostat and Controllers
- Air Balancing
- Building Management System
- Testing and commissioning
- Approval Process from Authorities
- As Built Drawings
- Operation and Maintenance Manual
Fire Fighting System
HVAC – Heating, Ventilation & Air Conditioning
HVAC – Heating, Ventilation & Air Conditioning
Supply and installation of the following Fire Fighting System
- Preparing Builder work drawings
- Preparing Shop drawings
- Preparing Coordination drawings
- Preparing Construction drawings
- Installation of Sprinkler Pipes
- Installation of Zone Control Valve
- Installation of Wet Riser Pipes
- Installation of Sprinkler Heads
- Installation of Breeching Inlets
- Installation of Fire Extinguisher
- Installation of Fire Blankets
- Installation of Fire Hose reel Cabinets
- Installation of PRVs, Isolation Valve…etc.
- Installation of Landing Valves & Fire Hose Reels
- Installation of Suppression System (Clean Agent System, Deluge System, Pre – action System… etc.)
- Installation of Fire Pump Rooms including all networks, Valves, accessories, control Panel, Alarm Check Valves, NRVs…Etc.
- Pressure Testing for Fire Fighting Pipes
- Labelling and Identification
- Testing and commissioning
- Approval Process from Authorities
- As Built Drawings
- Operation and Maintenance Manual
Key Services
- Correct Testing, Adjusting & Balancing of HVAC Systems is essential. If a building is not balanced properly then many problems may arise, such as, ingress of hot air leading to major mold and fungus problems.
- CML International have a large established team of specialist technicians who are dedicated to hands-on commissioning of mechanical services. Having carried out some of the biggest projects in the region, CML can close out projects ahead of programmed, without cutting corners.
- Low Velocity Air Systems
- Variable Air Volume Systems
- Specialist Exhaust Air Systems (Kitchen Hoods / Smoke Control Systems, etc.)
- Staircase / Lift / Lobby Pressurization Systems
- Hospital Air Pressurization Systems
- Laboratory and Industrial Fume Ventilation Systems
- Chilled Water Air Handling Units)
- Packaged Air Handling Units
- Condenser Water Systems
- Glycol Systems
- Low Temperature Hot Water Systems
- AHU / Coil Performance Tests
- Sound Level Measurement
- Vibration Measurement
Plumbing & Drainage
Supply and installation of the following Plumbing & Drainage systems
- Preparing Builder work drawings
- Preparing Shop drawings
- Preparing Coordination drawings
- Preparing Construction drawings
- Installation of Low Level Network
- Installation of High Level Drainage Network
- Installation of PEX System, PPR Network, etc.
- Installation of all Types of Water Pumps
- Installation of Water Heating and Cooling Systems
- Installation of Water Filtration System
- Installation of Acoustic Pipes, Fittings & Acoustic Lagging
- Installation of all types of traps, Manholes, Grease Traps…etc.
- Pressure Testing for Water Supply Pipes
- Gravity Testing for Drainage Pipes
- Installation of Sanitary Wares
- Labelling & Identification
- Sketches & Checklist
- Testing and commissioning
- Approval Process from Authorities
- As Built Drawings
- Operation and Maintenance Manual